NeuroGenesys.
Publications • Silicon & Analog Compute

Can analog or photonic hardware replace LLM inference silicon? AIMC for compute, optics for decode interconnect

• Synthesis •

PDF Save

Key findings

  • In the end-to-end decode build, analog mixture-of-experts at 10,108 µJ per token tied digital expert parallelism at 10,258 (±1.5%) while paying a 1.9-point accuracy tax.
  • A monolithic classifier (0.760) beat the best mixture-of-experts (0.741) on the frozen-ViT testbed, so routing bought no accuracy, only conditional compute.
  • The feed-forward layers that analog mixture-of-experts accelerates are 18.8% of decode energy dense and 2.8% sparse; attention and the KV cache dominate 81–99%.
  • Full-model analog in-memory compute's decode win fell from 3.86× at 2k context to 1.05× at 131k in the cost model, and a later 2026 re-gating found its speedup figures have no external support.
  • Optical KV movement at an honest 4.6 pJ/b wall-plug was 1.6× worse in energy than board electrical; optics' only durable rationale is bandwidth-density feasibility at extreme scale.

Consolidates the whole campaign: ~54 pre-registered experiments across 5 run-once rounds + a 106-agent deep-research literature cross-check + the B6 physics decider. Question: can neuromorphic photonic/analog hardware replace inference hardware for foundational LLMs? Method throughout: pre-register predictions + kill-conditions, run once, report failures, no strawmen (methodology-honest-evaluation).

Substrate for algorithm rounds: frozen ViT-B/16 CIFAR-100 + TinyImageNet + synthetic. Cost rounds built on calibrated pim_baseline.AIMC_RERAM constants. Diagnostic testbed — read relative movements, not absolute accuracies.


What each round settled

Round 1 — where's the bottleneck? (E1–E10)

Substrate works: selection law ACC=A_sel·p_within transfers to analog exactly (E1); analog experts feasible at 3-bit/ENOB~4 (E2); MoE recreates the batch-1 weight-resident regime at E≈128 (E5); PISA-style dependency-aware dispatch mapping cuts stalls 92% (E10). Bottleneck = routing ε≈0.5, and only routing (E9).

Round 2 — the router (R1–R10)

Corrected round 1's own headline: "write-time structured codes" were an artifact of a badly-fit baseline — structured codes == trivial ridge-to-one-hot exactly (R1/R2/R3/R8). Real lever = a plain discriminative ridge linear router (CIFAR 0.42→0.73). With it, ACC rises with expert count (R5) and survives 4-bit (R7). The reframe that matters: a monolithic classifier (0.760) BEATS the best MoE (0.741) — routing buys NO accuracy, only conditional compute. Soft routing, gating, metric keys all failed.

Round 3 — sparse-analog compute economics (C1–C10)

C3 is decisive (Amdahl): the FFN that analog-MoE accelerates is 18.8% of decode energy dense, 2.8% sparse; attention+KV dominate 81–99%. Conditional compute touches <3% of decode. C6: 9-pt accuracy tax, unfixed by grouping. C9: on language-like overlapping data the routing lever evaporates. C10: drift not a blocker. (C2 leakage model inconclusive; C5 "476×" was a retired weight-restreaming strawman.)

Round 4 — optical interconnect for KV movement (I1–I13)

Attacks the 81%. Optical KV movement = modest win in the right place. I2 break-even 3.2 cm; I6 dispatch is tiny vs KV. I11 (sensitivity): the energy win is NOT robust — flips at opt floor ~2.84 pJ/b vs base electrical (2.4× margin) and ~1.68 pJ/b vs advanced SerDes (1.4× margin); honest laser wall-plug (~3 pJ/b) puts optics behind advanced electrical. I12/I13 (GQA/quant realism): every threshold shifts 8–64× — pin-wall L* moves 24k→381k→1.5M context; on-package HBM holds batch 3–165 at 32k, so off-package is forced only by ~1M context or high batch, not ordinary serving.

Round 5 — stress the interconnect win (S1–S10)

The board-level energy win is DEAD under honest laser power: utilization cliff at U=0.42 (S2); at realistic U=0.3 optics is 3.4× worse (S10); end-to-end −32% (S9). Culprit = laser static × low utilization (thermal negligible, S4). Survives only at long reach (rack/disaggregated, S5/S8) and as a power-independent bandwidth-density necessity (S7) — which I12 shows only bites at extreme scale.

B6 — the physics decider (deep-research-identified)

REFUTED as a blocker. Analog accumulation SNR is width-independent to d=8192 for ternary/2/4-bit, for both tiled and untiled, as long as the ADC is range-calibrated (√d signal / √d noise cancel). Collapse appears only under a naive fixed-range ADC — a design mistake real AIMC avoids. Binding constraint reverts to the known B5 ceiling (~4-bit + hardware-aware retrain + drift). Residual risk = correlated column drift (a B5/retention problem), not width.


The final verdict

Can photonic/analog hardware replace foundational-LLM inference hardware? No — but there is one narrow, honest niche, and it is an interconnect story, not a compute story.

  1. Analog compute is feasible but pointless for this goal. It works (B6, E2), but (a) MoE routing buys zero accuracy over a monolithic classifier (R-round), and (b) the FFN it accelerates is <19% of decode energy (C3). You'd be optimizing the wrong 19% with a structure that adds a routing tax.

  2. The only durable lever is optical interconnect for data movement — and even it is bounded on two sides:

    • Energy win is fragile. It flips within the plausible CPO parameter range once laser wall-plug power and realistic (~30%) link utilization are charged (S-round, I11). It survives only at long reach (rack/disaggregated).
    • The robust part — bandwidth-density necessity — only bites at extreme scale. With the GQA + KV-quantization every 2026 model uses, electrical suffices to ~381k context; optics becomes physically required only at ~1M-context / high-batch pooled-KV serving (I12/I13).
  3. So the defensible north star is narrow and specific: optical interconnect for KV/activation movement in extreme-scale serving (long-context, high-batch, disaggregated-memory) — deployed for bandwidth density you cannot get electrically, NOT for an energy win, and NOT to do the model's math. It competes against advancing electrical SerDes and mature programmable-switch ASICs.

This reconverges — from four independent directions — on the program's standing conclusion (project-photonic-falsification-machine, project-validate-and-ship): the durable optical win is interconnect, not compute; and a strong simple baseline beats the clever structure. The co-design is not refuted as physics (B6), but it is bounded to a narrow, interconnect-only, extreme-scale niche as an engineering proposition.

Honest bounds on this whole campaign

  • Algorithm rounds use frozen-ViT/prototype experts — directional, not exact vs LLM works that train experts end-to-end (deep-research caveat A_testbed).
  • Cost/link constants are literature-scale ASSUMPTIONS; I11 shows the energy verdicts are sensitive to them (the density verdict is sturdier).
  • Not yet built: B7 (photonic-vs-AIMC for transformers, externally unresolved — LightML tension).

B8 — the decisive system build (DONE): confirms the terminus

End-to-end decode cost, every finding baked in (results/SYNTHESIS-B8.md, b8_results.json):

  • B8a (moderate, on-package KV): analog-MoE (10,108 µJ/tok) ties digital expert-parallel (10,258, ±1.5%) while paying a 1.9-pt accuracy tax. The conditional-compute win is an MoE-sparsity win digital hardware also captures — analog adds nothing at the system level and costs accuracy.
  • B8b (extreme, off-package KV): optical KV at honest 4.6 pJ/b wall-plug = 1.6× worse energy than board-electrical. Optics is an energy-LOSER.
  • B8c: optics' only durable rationale = bandwidth-density feasibility (electrical needs metres of impossible beachfront at scale).
  • B8d verdict: NO general replacement. The surviving niche (optical pooled-KV fabric at extreme-scale serving, deployed for feasibility not energy) = already Celestial AI / Lightmatter's shipping thesis → the differential contribution is quantification + negatives, not a new direction.

FINAL TERMINUS (co-design): the analog-MoE co-design is feasible physics (B6) but not a worthwhile engineering bet — MoE routing adds no accuracy and the FFN is the wrong slice. Fifth reconvergence on interconnect-not-compute + strong-baseline-wins.

A-series — "But what about AIMC?" (REVISES the terminus)

The MoE framing hid AIMC (the program's established right competitor). Running full-model AIMC directly (results/SYNTHESIS-aimc.md, aimc_results.json):

  • A4: AIMC crushes static-weight matmul — 30.6× vs digital, 4.2× vs optics (worse-PIM re-confirmed: if analog, AIMC not photonics).
  • A2/A6: full-model AIMC decode win is real but context-dependent — 3.86× at L=2k → 1.2× at L=32k → 1.05× at L=131k (dilutes as KV movement dominates).
  • A3: AIMC's real niche is PREFILL (compute-bound, no KV re-read): 19× at P=512, 9.3× at P=2048, diluting only when P² attention takes over.
  • A5: ADC dominates AIMC energy (60%), not the 2 fJ MAC — an interface story like optics.
  • A7: feasible at 4-bit + hardware-aware retrain + drift-managed (B6: not a width wall).

REVISION: "analog compute is a system-level no-op" was too harsh — an artifact of the MoE-long-context-decode framing. AIMC is a REAL efficiency for the COMPUTE-BOUND regime (prefill 9–19×, short-context decode ~4×), the strongest analog substrate, beating optics. It does NOT transform long-context autoregressive decode (~1.2×, KV-bound — the same wall optics/MoE hit). Clean separation of the program's two truths: AIMC owns the compute half of LLM inference (prefill/short-context/batched); the KV/interconnect problem owns the other half. "Replace inference HW" is still No as a whole, but AIMC is a defensible accelerator for the (large, growing) compute-bound share — a complement, not a replacement.


UPDATE 2026-07-30 — the interconnect claim was on the WRONG PHASE (deep-research sweep)

A hostile verification sweep against the 2026 literature, prompted by a YC kernel/chip talk that asserted "networking can consume up to 50% of total runtime for Llama MoE prefill."

The 50%-of-prefill number is REFUTED as stated — it is a blend of three real numbers

Real sourceWhat it actually measures
MixNet, LLaMA-MoE 42–58%training, 128×H800, 400 Gb/s
UBEP ~50% (arXiv 2607.06202, SIGCOMM'26)decode, Huawei CloudMatrix384
TokenWeave's "~50% DeepSeek EP"traces to an SGLang blog that never says it

Every measured inference-prefill number is far lower: 9.6% comms + 12.3% sync on GB200 (NVIDIA DWDP); 8–11% dense TP=8 on A100 NVLink (FLUX, arXiv 2406.06858); TokenWeave measures 9–23% end-to-end across Llama-3.3-70B / Qwen2.5-72B / Mixtral-8x22B. And UBEP, the one genuine ~50% inference figure, debunks itself: "MoE communication accounts for roughly 50% of per-token latency … but only about 20% of actual hardware execution time, suggesting substantial dependency stalls." Half the "networking cost" is stall, not network work.

The premise is INVERTED, and this relocates our own claim

arXiv 2507.14392 (OSU, Jul 2025): "The decode stage dominates communication volume … generating 127× more operations than prefill." TP=8 across two nodes improves TTFT (90→30 ms) while wrecking TPOT. Prefill is compute-bound and tolerates communication; decode goes communication-bound off-node.

This program's interconnect analysis (rounds 4–5, I1–I13 / S1–S10) framed the optical-KV story around movement in general and leaned on prefill-side intuitions. The correct phase is decode.

And the relocation makes the case STRONGER, first-party

DeepSeek ISCA'25 (arXiv 2505.09343) — in the dual-microbatch-overlap regime communication is the whole critical path: 120.96 µs/layer at 50 GB/s InfiniBand → 14.76 ms TPOT floor (67 tok/s); at 900 GB/s NVLink → 0.82 ms (~1200 tok/s). 18× from interconnect bandwidth alone. And FLUX shows the interconnect, not the workload, sets the number: 8–11% on A100 NVLink vs 40–75% on the same A100s over PCIe.

Interconnect bandwidth binds hardest in decode — the same phase where data residency wins and where AIMC does not help (A-series: long-context decode ~1.2×, KV-bound). The two halves of this program's verdict interlock rather than compete: AIMC owns the compute half; the decode half is an interconnect problem, and that is where optics has its case.

Citation hygiene flagged by the sweep — applies to our own drafts

  • Lina's all-to-all percentage differs across v1 / v2 / ATC'23 (34.1% vs 37.4%). Cite with a version number or not at all. Its Table 1 also splits inference 26.2–32.5% vs training 35.4–39.5% — inference runs ~8 points lower, the direction that undercuts the headline.
  • T3 (ASPLOS'24) 34–46% (→75% if GEMMs double) is SIMULATION, not measurement.
  • FlashMoE's "68%" cites Janus and Lancet; neither says it (Lancet says 40%, training).

Net effect on the campaign's four standing verdicts: unchanged. The optical-interconnect survivor keeps its rack-reach qualifier and gains a phase correction and a much better first-party number. Nothing here rehabilitates optical compute.

The four standing verdicts, re-gated against 2026 sources

#ClaimVerdict
(a)AIMC owns the COMPUTE half (prefill 9–19×, short decode ~4×), not long-context decode (~1.2×, KV-bound)SPLIT. Decode half STILL VALID — confirmed 4-for-4 by IBM primary sources that keep KV+attention digital by design. Compute half NEEDS REVISION: digital CIM now wins the like-for-like INT8 metric, and our 9–19× / 4× / 1.2× have no external support
(b)Optical compute dead; optical interconnect survivesSTILL VALID, two corrections: reach qualifier moves to beyond rack (copper won the NVL72 scale-up domain outright), and the phase is decode, not prefill
(c)The mechanism is data residency, not cheap multipliesSTILL VALID — the strongest surviving claim. SN40L ~3.6–4× B200 accuracy-per-joule; GroqRack 4× faster decode while 41× slower at prefill — residency exactly as characterised
(d)The win decays as d_model growsNEEDS REVISION — right direction, wrong variable. Restate against total params vs a frozen ~0.5 GB/reticle ceiling, with MoE accelerating the decay

The finding to act on first — our cost models are stale for the opposite reason we assumed

Only ~1.5×/yr of the digital baseline's improvement is silicon. The 18–33×-per-16-months headline numbers are precision + architecture + software. So the models are not stale because GPUs got faster — they are stale because digital moved to native 4-bit, which is exactly analog's accuracy ceiling (IBM's own NeurIPS 2025 result).

That is the whole moat argument inverted. This program priced analog's advantage as tolerance of low precision; digital has now taken the low-precision territory outright, at the precision where analog tops out. Any future analog claim must clear a native-4-bit digital baseline, not an INT8 one.

Claim-drift audit — inputs that were wrong, including ones this repo relayed

InputTruth
"NVIDIA for prefill + Cerebras for decode" (deployed split)does not exist
"~3× intelligence-per-watt over 2 yr"5.3× (3.1× was the model-only term)
"imperfect routers capture 50–70%"80% of oracle / 64.3% absolute
"EnCharge ~150 TOPS/W"~24, precision undisclosed
"NVIDIA CPO 3.5×"5×
"88.7% of queries routable"correct
"18× intelligence-per-joule in 16 months"correct

Unclosed gap, flagged: copper reach in metres at 224G/lane, and the copper-vs-optical pJ/bit crossover — five attempts, no primary source. Any crossover-reach constant in photonics/ cost models is therefore unsourced and must be labelled as such.

Related research

Learn the background

Leadership

A word from the founder — on why the brain is the blueprint, and why the next decade of intelligence will be built here.

"The brain is the universe's only proof that general intelligence is possible. We treat it as the blueprint."

From cortical interfaces to photonic silicon, every program at NeuroGenesys exists to answer one question: how does intelligence arise — and how do we build it safely.

Will Schulz

Will Schulz

Founder, NeuroGenesys • AW3 Technology